Ver Fonte

upstream-watch 10-15: MiMo 4x rebase done (90/100, +19% decode)

Alexander Korolev há 1 semana atrás
pai
commit
28af1b0d4d
1 ficheiros alterados com 5 adições e 2 exclusões
  1. 5 2
      specs/tech-architecture/upstream-watch-2026-10-15.md

+ 5 - 2
specs/tech-architecture/upstream-watch-2026-10-15.md

@@ -57,6 +57,9 @@ TEB pin now **v2.8.0** (97 scenarios).
   (`GLM-5.3-Flash-NVFP4-MXFP8-CSF-QAD`, `GLM-5.3-NVFP4-CSF`,
   `Qwen3.8-Flash-Next-NVFP4-MXFP8-CSF-QAD`) under the LIL license.
 - **Action:** proceed with the MiMo 4x rebase on this image (plan unchanged).
+  **DONE 2026-10-15:** re-served on dgx58-switch, recipe re-pinned to
+  `e21ba936…` (recipes `a09e85f`), bench **90/100** v2.8.0, tg 66.2/80.7
+  c1/c2 (+19% decode vs the dev-20261004 anchor). Reports `040e9f2`.
   DCP2 is a candidate datapoint for the 2x lane (context ceiling) — but it
   needs the CSF checkpoint + their toolchain, so treat as a separate
   experiment lane, not a kindling change.
@@ -113,8 +116,8 @@ TEB pin now **v2.8.0** (97 scenarios).
 
 ## Recommended order (updated)
 
-1. **MiMo 4x rebase** — 2026.10.4 validates the pre-pulled image; do it when
-   dgx3/4/6/8 free (they're off now).
+1. **MiMo 4x rebase** — **done 2026-10-15** (dgx58-switch, 90/100, +19%
+   decode; shift log 2026-10-15).
 2. **v0.32.0 stable → kindling base re-pin** — flashinfer 0.7.1 + SM12x
    NVFP4 KV + DSpark scheduler/DFlash graph fixes in one bump; bench-gate
    vs 95/100.